Resolved the blockage of fishmeal feed.
Introducing a case where the blockage of fish meal feed was resolved with the new bridge breaker!
In the fish feed manufacturing equipment, blockages were occurring at the junctions of the transport piping. When bridges or blockages occurred inside the piping or chutes, we would manually hammer from the outside or, if there was an inspection port nearby, poke the blockage with a rod. The air aeration system using rubber disk air pads easily resolved the issue. As a result, there was no longer a need to climb to the blockage points (high places), eliminating risks and improving efficiency. 【Overview】 ■ Installation details: Piping 250φ to 300φ, 350□ chute ■ Installation model: Broady Disk Mini (pad diameter 50 mm) For solving blockages, bridges, and rat holes in powder and granular equipment related to feed, fertilizers, and other agricultural and fishery applications, this method, which is low-cost and easy to install, will clear users' problems. *For more details, please refer to the PDF materials or feel free to contact us. *Our website features numerous case studies, which can be accessed via the link below.
- Company:ミナギ
- Price:Other